Amador Water Agency – Tank A and B Replacement Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2020080464
- Lead Agency
- Amador Water Agency (AWA)
- Document Title
- Amador Water Agency – Tank A and B Replacement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 10/28/2020
- Document Description
- The Proposed Project would replace the two existing aboveground water storage tanks, the 250,000 gallon Tank B and 500,000 gallon Tank A, with two new one-million gallon aboveground water storage tanks on the adjacent parcel.
- Contact Information
-
Brandt Cook
Amador Water Agency
Lead/Public Agency
12800 RIdge Road
Sutter Creek, CA 95685
Phone : (209) 257-5206
bcook@amadorwater.org -
Amador Water Agency
Project Applicant
Location
- Coordinates
- 38°26'52.8"N 120°32'28.4"W
- Counties
- Amador
- Regions
- Northern California
- Cross Streets
- Elkhorn Court
- Zip
- 95666
- Parcel #
- 023-160-013 & 023-160-028
- Other Location Info
- The Proposed Project is located in Amador County, California approximately 50 miles southeast of the City of Sacramento on the eastern slope of the Sierra Nevada. The Proposed Project is located just south of the end of Elkhorn Court on the undeveloped parcel next to the existing Tank A and B.
Notice of Determination
- Approving Agency
- Rick Ferriera, Operations and Engineering Manager
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- https://amadorwater.org/wp-content/uploads/2020/10/AWA_Tank_AandB_-IS_MND_Final-10-22-20.pdf
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- AWA_Tank_AandB_NOD_10_27_20 PDF 756 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.