Sheep Creek Water Co. - Six Underground Water Wells

2 Documents in Project

Summary

SCH Number
2020070042
Lead Agency
San Bernardino County
Document Title
Sheep Creek Water Co. - Six Underground Water Wells
Document Type
NOD - Notice of Determination
Received
Posted
8/17/2020
Document Description
Environmental Review Unrelated to Planning Project for six (6) proposed groundwater production wells to increase Sheep Creek Water Company’s (SCWC) potable water supply in compliance with the State Water Resources Control Board’s Compliance Order No. 05-13-18R-002. The wells are to be located on three different parcels; four (4) wells will run concurrently while the other two (2) will serve as backup wells. The wells will each be equipped with an above ground pump motor on top of an approximate 10-foot x 10-foot concrete pad. At each new well, the new pumps will be enclosed with a masonry block building to minimize exterior noise levels at the nearest residences (about 200 feet from each well site). To minimize onsite water consumption no new landscaping will be installed at any of the three well sites. At each of the well locations, the closest connection to SCWC’s system is within the adjacent roadways. Each well will be drilled to approximately 1,500 feet deep using a reverse rotary drill unit.

Contact Information

Name
Magda Gonzalez
Agency Name
County of San Bernardino - Land Use Services
Contact Types
Lead/Public Agency

Name
Agency Name
Sheep Creek Water Company
Contact Types
Project Applicant

Location

Cities
Phelan
Counties
San Bernardino
Regions
Countywide, Unincorporated
Cross Streets
Sunnyslope Rd, Sheep Creek Rd, & Nielson Rd, Cambria Rd, and Elsinore Rd
Zip
92371
Parcel #
3066-221-33, 3066-181-26 and 3066-321-26

Notice of Determination

Approving Agency
County of San Bernardino
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print