Flume 30 Replacement Project

3 Documents in Project

Summary

SCH Number
2020069001
Lead Agency
El Dorado Irrigation District
Document Title
Flume 30 Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
8/12/2020
Document Description
The proposed project involves replacing 350 feet of wooden flume structure with reinforced air-placed concrete, canal bench improvements, improvements to Forest Service Road 10-08YE, and construction of a new segment of access road. The existing wooden flume and substructure would be demolished and disposed at an off-site disposal area, in accordance with applicable regulations. A new flume of pre-cast concrete voided slab would be installed to span Bull Creek. The eastern abutment would not require additional improvements and could be used with only minor modification. The western abutment would be removed and rebuilt using a system similar to the eastern reinforced shotcrete facing and rock anchor tie backs to provide stability. Access to the project area would primarily rely on the use of existing roads. A new road of approximately 2,200 lineal feet would need to be constructed to allow access to the existing canal bench. Project construction is anticipated to take approximately 5 to 6 months. The project site is not identified on the lists specified in Government Code section 65962.5.

Contact Information

Name
Michael C. Baron
Agency Name
El Dorado Irrigation District
Contact Types
Lead/Public Agency

Name
Agency Name
El Dorado Irrigation District
Contact Types
Project Applicant

Location

Counties
El Dorado
Other Location Info
The Project site is located south of U.S. 50 along the El Dorado Hydroelectric Project (Project No. 184) El Dorado Canal (Canal) between Kyburz and Pollock Pines in El Dorado County within Sections 33, Township 11 North, Range 14 East, ofthe USGS Riverton Quadrangle.

Notice of Determination

Approving Agency
El Dorado Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.