The Meadows at Bailey Canyon Specific Plan EIR

4 Documents in Project

Summary

SCH Number
2020060534
Lead Agency
City of Sierra Madre
Document Title
The Meadows at Bailey Canyon Specific Plan EIR
Document Type
NOD - Notice of Determination
Received
Posted
9/28/2022
Document Description
The proposed project would establish The Meadows at Bailey Canyon Specific Plan (Specific Plan), which would establish the zoning and development standards to guide future development of single-family residential uses on approximately 9.19 acres of the 17.30-acre project site, and 3.39 acres of open space (including a 3.04-acre neighborhood public park). A 1.04-acre grading and landscape buffer would be located within the northern portion of the project site. In addition to the ministerial lot line adjustment required to consolidate the two lots that make up the project site into one and adjust the site’s northern boundary further to the north, the discretionary actions before the City include a proposed General Plan amendment to change the land use designation for the project site from Institutional to Specific Plan, and a zone change to change the zoning of the project site from Institutional to Specific Plan.

Contact Information

Name
Vincent Gonzalez
Agency Name
City of Sierra Madre
Job Title
Planning Director
Contact Types
Lead/Public Agency

Location

Cities
Sierra Madre
Counties
Los Angeles
Regions
Citywide
Cross Streets
west of intersection of West Carter Avenue and North Grove Street
Zip
91024
Total Acres
17.3
Parcel #
5761-002-008
State Highways
State Route 164
Railways
N/A
Airports
N/A
Schools
Various
Waterways
wetlands and riparian features present east of the site
Township
1N
Range
11W
Section
17
Other Location Info
700 North Sunnyside Avenue, Sierra Madre, Los Angeles County, CA 91024

Notice of Determination

Approving Agency
City of Sierra Madre
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://www.cityofsierramadre.com/cityhall/city_manager_s_office/transparency/Meadows

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print