University Circle Phase II Office Project

3 Documents in Project

Summary

SCH Number
2020060144
Lead Agency
City of East Palo Alto
Document Title
University Circle Phase II Office Project
Document Type
NOD - Notice of Determination
Received
Posted
5/6/2022
Document Description
The project proposes to redevelop the existing parking lot located in the southeast corner of the project site with a six-story, approximately 180,000-square-foot, LEED-Platinum equivalent office building above three levels of below-grade parking. The project would connect to existing utilities lines (e.g., water, sanitary sewer, and storm drain lines) on Woodland Avenue and Manhattan Avenue and would incorporate stormwater detention measures to store and control project peak flow rates. Vehicular site access would continue to be provided via University Circle and Manhattan Avenue upon project completion. Project construction would include removal of the existing parking lot improvements and landscaping, excavation and construction of the below-grade parking garage, and construction of the office building.

Contact Information

Name
Elena Lee
Agency Name
City of East Palo Alto
Job Title
Planning Manager
Contact Types
Lead/Public Agency

Location

Cities
East Palo Alto
Counties
San Mateo
Regions
Citywide
Cross Streets
University Avenue, Woodland Avenue
Zip
94303
Total Acres
11.84
Jobs
720
Parcel #
063-680-020
State Highways
109
Airports
Palo Alto Airport
Schools
Laurel School Upper Campus
Waterways
San Francisquito Creek

Notice of Determination

Approving Agency
City of East Palo Alto
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Mateo
Final Environmental Document Available at
https://www.ci.east-palo-alto.ca.us/planning/project/university-circle-phase-ii

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print