Corn Camp Groundwater Recharge Pond Project
2 Documents in Project
Summary
SCH Number
2020060092
Lead Agency
Buena Vista Water Storage District
Document Title
Corn Camp Groundwater Recharge Pond Project
Document Type
NOD - Notice of Determination
Received
Posted
9/18/2020
Present Land Use
Approximately 20 miles west of Bakersfield, Kern County, CA
Document Description
The District proposed to construct a 50-acre recharge pond that would expose sand for percolation at 8 feet deep. Approximately 252,900 cubic yards of soil would be excavated and used to construct berms to contain the pond. Maximum recharge estimates, based on a full-year operation schedule, would average 24,500 AFY. Water from existing District sources would be delivered to the recharge pond via the existing Corn Camp Canal and/or 7th Standard Pipeline. The District would also install a pump station and 30-foot-tall water storage tank. The proposed Project is located on the southwest corner of the Corn Camp Road and Sullivan Road intersection.
Contact Information
Name
Tim Ashlock, Engineer-Manager
Agency Name
Buena Vista Water Storage District
Contact Types
Lead/Public Agency
Phone
Email
Name
Agency Name
Tim Ashlock
Contact Types
Project Applicant
Location
Cities
Bakersfield
Counties
Kern
Cross Streets
Southwest corner of the Corn Camp Road and Sullivan Road intersection
Zip
93206
Total Acres
81
Airports
N/A
Schools
N/A
Township
29S
Range
23E
Section
16
Notice of Determination
Approving Agency
Buena Vista Water Storage District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.