Master Joint Revocable Permit - Paramount Pipeline, LLC
8 Documents in Project
Summary
SCH Number
2020059038
Lead Agency
Port of Los Angeles
Document Title
Master Joint Revocable Permit - Paramount Pipeline, LLC
Document Type
NOD - Notice of Determination
Received
Posted
3/4/2021
Document Description
Paramount Pipeline, LLC (Paramount Pipeline) submitted an application to each the Port of Los Angeles and the Port of Long Beach (collectively referred to as the “Joint Ports”) for the issuance of a Master Joint Revocable Permit, seeking in part, permission and entitlement for a change-in-use from petroleum to hydrogen gas for an existing subsurface pipeline owned by Paramount Pipeline and operated by Air Products and Chemicals, Inc. —“Line 4”.
The potential environmental effects associated with the transport of hydrogen gas through the pipeline “Line 4” was assessed in the Air Products Hydrogen Pipeline Project Final Environmental Impact Report (EIR) certified under the California Environmental Quality Act (CEQA) by the Lead Agency, the City of Carson, on November 10, 2020 (State Clearinghouse No. 2020059038).
Contact Information
Name
Leah Kohler
Agency Name
City of Los Angeles- Port of Los Angeles (Harbor Department)
Contact Types
Responsible Agency
Phone
Email
Location
Counties
Los Angeles
Regions
Citywide
Other Location Info
Line 4: lntermodal Terminal to N. Paramount Blvd/South St. in Los Angeles County
Notice of Determination
Approving Agency
City of Los Angeles- Port of Los Angeles (Harbor Department)
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://kentico.portoflosangeles.org/getmedia/d6c2fe2f-b197-4d25-a4df-287d923d6b27/Air-Products-FOF-SOC-MMRP_1-26-21
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.