Design Plan 22-05: South Campus Building E
11 Documents in Project
Summary
SCH Number
2020059028
Public Agency
March Joint Powers Authority
Document Title
Design Plan 22-05: South Campus Building E
Document Type
NOE - Notice of Exemption
Received
Posted
8/8/2022
Document Description
Description of nature, purpose, and beneficiaries of Project: The South Campus Building E project (Design Plan 22-05) was approved for the construction of a 200,000 square foot speculative warehouse on 13.68 acres zoned Business Park as specified in the March Business Center Specific Plan (SP-1, A8). Building height was approved up to 48-feet at top of parapet. The site is planned to accommodate parking for 205 passenger cars, which would include carpool, electric vehicle and accessible stalls and 11 bike parking loops. The truck court is to be located along the east elevation and will include 31 dock high doors and 82 truck trailer parking stalls. The truck court would be completely screened from Caroline Way by a 12-foot-tall Meridian theme screen wall. Additionally, the west parking area will be screened by a 10-foot-tall Meridian theme screen wall from Barton Street. Access is proposed off Gless Ranch Road (passenger cars only) and Caroline Way (truck and passenger cars). There will be no access off Barton Street.
Contact Information
Name
Lauren Sotelo
Agency Name
March Joint Powers Authority
Job Title
Senior Planner
Contact Types
Lead/Public Agency
Phone
Email
Name
Timothy Reeves
Agency Name
Meridian Park, LLC
Job Title
Vice President
Contact Types
Project Applicant
Phone
Location
Cities
March Joint Powers Authority
Counties
Riverside
Regions
Citywide
Cross Streets
Gless Ranch Road/ Caroline Way
Zip
92518
Total Acres
13.68
Other Information
Address: 20036 Caroline Way, Riverside, CA 92518
Notice of Exemption
Exempt Status
Ministerial
Type, Section or Code
Sec. 21080(b)(1); 15268(a)
Reasons for Exemption
Reason why project was exempt: The approval of the design plan is exempt from environmental review pursuant to State CEQA Guidelines Section 15268 (a) for Ministerial Projects. The project was previously analyzed under the Subsequent Environmental Impact Report for the Meridian South Campus Specific Plan and Village West Drive Extension Project (SCH #2020059028). The Project underwent a Ministerial Review process and was found consistent with the development standards under the March Business Center Specific Plan (SP-1, Amendment No. 8), the March Business Center Design Guidelines, and the adopted Mitigation Measures for the Meridian South Campus Specific Plan and Village West Drive Extension SEIR (SCH 2020059028). All services and access to the site is made available through the Specific Plan (SP-1, A8). The determination that the Design Plan was consistent involved no discretionary judgement by the March Business Center Implementation Committee and involved only the use of fixed and objective standards rather than subjective decision making.
County Clerk
Riverside
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.