La Mirada High School New Football Stadium Project, Removal Action Workplan

3 Documents in Project

Summary

SCH Number
2020040345
Lead Agency
Norwalk-La Mirada Unified School District
Document Title
La Mirada High School New Football Stadium Project, Removal Action Workplan
Document Type
NOD - Notice of Determination
Received
Posted
12/20/2021
Document Description
Site assessment identified two specific areas of concern at the La Mirada High School site. These two sites represent (1) the canyon fill area, located in the western portion of the site; and (2) the cut area, located in the eastern portion of the site. Both areas have reported chemical concentrations (i.e., arsenic) that were above DTSC screening levels. The cleanup activities will involve soil excavation and the use of conventional excavation equipment, such as backhoes, loaders, and dozers to remove an estimated 224 cubic yards (313 tons) of impacted soil from the Site. Excavated soil would be either directly loaded into staged trucks or would be temporarily stockpiled on plastic sheeting next to each excavated area until it can be loaded out for offsite disposal. The soils removed from these areas would be transported offsite to an appropriate, licensed facility for disposal.

Contact Information

Name
Aslam Shareef
Agency Name
Department of Toxic Substances Control
Job Title
Hazardosu Substances Engineer
Contact Types
Responsible Agency

Location

Cities
La Mirada
Counties
Los Angeles
Regions
Citywide
Cross Streets
13520 Adelfa Drive

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://www.envirostor.dtsc.ca.gov/public/profile_report.asp?global_id=19820104

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print