North Shore Pipeline Replacement Project (Streambed Alteration Agreement No. 1600-2020-0069- R6)

3 Documents in Project

Summary

SCH Number
2020040323
Lead Agency
San Bernardino County
Document Title
North Shore Pipeline Replacement Project (Streambed Alteration Agreement No. 1600-2020-0069- R6)
Document Type
NOD - Notice of Determination
Received
Posted
9/16/2020
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement number 1600-2020-0069-R6, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Southwest Gas. The North Shore Replacement Pipeline Project includes the replacement and upsizing of the existing 6-inch natural gas high pressure main with an 8-inch high pressure main along Northshore Drive and Stanfield Cutoff. The project impacts 0.49 acres of Fish and Game Code section 1602 resources and measures to avoid and minimize affects to fish and wildlife resources.

Contact Information

Name
Marina Barton
Agency Name
California Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
Southwest Gas
Contact Types
Project Applicant

Location

Cities
Big Bear Lake
Counties
San Bernardino
Regions
Southern California
Other Location Info
The project is located at Big Bear Lake, in the County of San Bernardino, State of California;Latitude 34°15’43.36” N, Longitude 116°53’49.03” W in Sections 16, 17, and 18, Township 2 North, Range 1 East, of the U.S. Geological Survey (USGS) map Fawnskin, California 7.5-minute topographic quadrangle map.

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print