North Shore Pipeline Replacement Project

3 Documents in Project

Summary

SCH Number
2020040323
Lead Agency
San Bernardino County
Document Title
North Shore Pipeline Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
7/14/2020
Document Description
The project involves upgrading existing high-pressure natural gas pipeline infrastructure along North Shore Lane, North Shore Drive/State Route 38, and Stanfield Cutoff to increase the pressure and natural gas feed into the Big Bear area for the purpose of meeting existing and future demands. The proposed improvements would involve replacing the existing 6-inch high-pressure steel natural gas pipeline with an 8-inch high-pressure steel natural gas pipeline. Other lateral pipelines would also be upgraded. The existing natural gas pipelines would be abandoned in place and capped off, and new natural gas pipelines would be installed primarily by open trench excavation with some areas installed by horizontal directional drilling. The project would require an Encroachment Permit and Construction Permit from the County of San Bernardino; Encroachment Permit from the U.S. Forest Service and California Department of Transportation; Section 1602 Streambed Alteration Agreement from the California Department of Fish and Wildlife; Construction Permit from the City of Big Bear Lake; and a National Pollutant Discharge Elimination System Construction General Permit and Waste Discharge Permit from the Santa Ana Regional Water Quality Control Board.

Contact Information

Name
Jim Morrissey
Agency Name
County of San Bernardino - Land Use Services Department
Contact Types
Lead/Public Agency

Name
Agency Name
PAMELA CHAVEZ- SOUTHWEST GAS CORP
Contact Types
Project Applicant

Location

Cities
Community of Bear Valley
Counties
San Bernardino
Regions
Southern California
Cross Streets
State Route 38/North Shore Drive and North Shore Lane
Zip
92314
Total Acres
Linear 2.3 miles
Parcel #
Not Applicable
State Highways
SR-38, SR-18
Railways
None
Airports
Big Bear Airport
Schools
Various
Waterways
Big Bear Lake
Township
2N
Range
1E
Section
17
Base
Sn Bndo

Notice of Determination

Approving Agency
County of San Bernardino
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.