Grover Beach Subsea Fiber Optic Cables Project

7 Documents in Project

Summary

SCH Number
2020040309
Lead Agency
California State Lands Commission (SLC)
Document Title
Grover Beach Subsea Fiber Optic Cables Project
Document Type
NOD - Notice of Determination
Received
Posted
6/24/2020
Document Description
The Project proposes to build and operate telecommunication infrastructure that will house fiber optic cables on land (1 .5 miles long going under the city of Grover Beach surface streets) and in the ocean (5- to 6-inch diameter landing pipes) going offshore Grover Beach and exiting at about 3,600 feet onto the ocean floor. The infrastructure and cables would carry telecommunication data to connect the United States with Singapore, Guam, Hong Kong, and Australia. Phase 1 would start in 2020 to build the infrastructure needed to bring up to four cables into Grover Beach. The State Lands Commission action is an approval of a 25-year General Lease - Right-of-Way Use through June 22, 2045.

Contact Information

Name
Drew Simpkin
Agency Name
California State Lands Commission
Contact Types
Lead/Public Agency

Name
Agency Name
RTI Infrastructure, Inc.
Contact Types
Project Applicant

Location

Cities
Grover Beach, Pismo Beach
Counties
San Luis Obispo
Other Location Info
Sovereign tide and submerged land in the Pacific Ocean

Notice of Determination

Approving Agency
California State Lands Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print