Rosamond Switching Station Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2020040291
- Lead Agency
- Los Angeles Department of Water and Power
- Document Title
- Rosamond Switching Station Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 8/12/2020
- Project Applicant
- Los Angeles Department of Water and Power
- Present Land Use
- Undeveloped Land, Rural Residential, Industrial (Solar and Wind Generation), Agricultural
- Document Description
- The project includes construction of a new 230 kilovolt (kV) switching station, Battery Energy Storage System (BESS), and Flexible Alternating Current Transmission System (FACTS) Device. The overall purpose of the project is to help meet broader goals towards increasing the use of sustainable renewable energy sources while decreasing the production of greenhouse gas and air pollution.
- Contact Information
-
Aiden Leong
Los Angeles Department of Water and Power
111 N Hope St, Room 1044
Los Angeles, CA 90012
Phone : (213) 367-0706
aiden.leong@ladwp.com
Location
- Coordinates
- 34°51'36.82"N 118°18'47.2"W
- Cities
- Rosamond
- Counties
- Kern
- Regions
- Citywide
- Cross Streets
- Rosamond Blvd, 100th St W
- Zip
- 93560
- Total Acres
- 120
- Parcel #
- Multiple - See MND
- Township
- 9N
- Range
- 14W
- Section
- 14
Notice of Determination
- Approving Agency
- Los Angeles Department of Water and Power
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- https://www.ladwp.com
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- NOD_Rosamond SS PDF 1230 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.