2075 Williams St. Industrial Project

2 Documents in Project

Summary

SCH Number
2020040075
Lead Agency
City of San Leandro
Document Title
2075 Williams St. Industrial Project
Document Type
NOD - Notice of Determination
Received
Posted
5/8/2020
Present Land Use
Solid Waste Transfer and Recycling Facility
Document Description
Currently, the project site is developed with and operates as a solid waste transfer and recycling facility. The current facility operates under an existing conditional use permit (CUP) (PLN2009-00022) from the City of San Leandro and a CalRecycle Enforcement Agency Registration Permit issued by County of Alameda Environmental Health Department Local Enforcement Agency. The existing facility is currently permitted to process a maximum of 174 tons per day of inert construction and demolition debris (CalRecycle 2019). The proposed project would modify operations of the facility to increase the maximum tonnage of materials that could be received and processed. Under the proposed project, maximum daily tonnage would increase from 174 tons per day to 350 tons per day. This would be an increase of 176 tons or an approximately 101 percent increase over existing conditions. The proposed project would require a modification to the existing conditional use permit in order to allow the proposed increase in materials accepted and processed at the facility.

Contact Information

Name
Andrew J. Mogensen, AICP, Planning Manager
Agency Name
City of San Leandro
Contact Types
Lead/Public Agency

Name
Agency Name
Certified Blue Recycling
Contact Types
Project Applicant

Location

Cities
San Leandro
Counties
Alameda
Cross Streets
Williams St. and Menlo St.
Zip
94577
Parcel #
77A-700-006-002 and 77A-700-16-003
Railways
Union Pacific Rail Road
Airports
Oakland International Airport
Schools
San Leandro School District

Notice of Determination

Approving Agency
City of San Leandro Board of Zoning Adjustments
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print