San Juan Creek Bridge Temporary Shoring Project
Summary
SCH Number
2020020210
Public Agency
California Regional Water Quality Control Board, San Diego Region 9
(RWQCB)
Document Title
San Juan Creek Bridge Temporary Shoring Project
Document Type
NOE - Notice of Exemption
Received
Posted
2/10/2020
Document Description
The Applicant proposes to move a heavy load across the railroad bridge (Mile Post 197.9) over San Juan Creek. This existing railroad bridge is scheduled to be replaced in 2021, and the proposed heavy load will exceed the existing bridge's weight capacity. Because the bridge in its current condition is incapable of holding this heavy load, the bridge will be temporarily supported by a jack system while the load crosses. The Project will temporarily support the bridge while the load crosses. Although the proposed San Juan Creek Bridge Replacement Project will begin in 2021, this move must occur in 2020.
Contact Information
Name
David Gibson
Agency Name
California Regional Water Quality Control Board San Diego Region
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
EnergySolutions
Contact Types
Project Applicant
Location
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15302
Reasons for Exemption
Class 2 consists of replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure reported and will have substantially the same purpose and capacity as
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.