Phase 1 Sewer Line Replacement Project (aka East Trunk/Vallecito Road Sewer Line)

3 Documents in Project

Summary

SCH Number
2020019083
Lead Agency
City of Angels Camp
Document Title
Phase 1 Sewer Line Replacement Project (aka East Trunk/Vallecito Road Sewer Line)
Document Type
NOD - Notice of Determination
Received
Posted
4/9/2020
Document Description
The proposed project includes upsizing and/or replacing 5,446± linear feet of deteriorating sewer line as two separate segments: (1) the East Trunk segment which encompasses the southern portion of the proposed project; and (2) the Vallecito Road segment which encompasses the northern portion of the proposed project. Construction methods to upsize and/or replace the existing sewer line include the following: remove and replace, pipe bursting, cured-in-place pipe liner, or new pipe installation. Pipe sizes along the existing sewer line vary between 10 and 15 inches, and the proposed project would upsize the sewer line at various locations to a maximum 18-inch pipe to increase flow capacity. The proposed project would replace most of the existing clay pipes with polyvinyl chloride pipes. No sites enumerated pursuant to Government Code Section 65962.5 regarding hazardous materials have been identified on site.

Contact Information

Name
Amy Augustine
Agency Name
City of Angels (Angels Camp)
Contact Types
Lead/Public Agency

Name
Agency Name
City of Angels
Contact Types
Project Applicant

Location

Cities
Angels Camp
Counties
Calaveras
Parcel #
See attached
Base
MDB&M
Other Location Info
Central Sierra Nevada foothills
Other Information
See NOD for full details

Notice of Determination

Approving Agency
City of Angels City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print