Pile Repair at Firebaugh and Buttonwillow Bridges (06-0U000)

2 Documents in Project

Summary

SCH Number
2020019059
Lead Agency
Caltrans, District 6 - Fresno/Bakersfield (California Department of Transportation, District 6)
Document Title
Pile Repair at Firebaugh and Buttonwillow Bridges (06-0U000)
Document Type
NOD - Notice of Determination
Received
Posted
5/8/2020
Project Applicant
Caltrans

Document Description
The project proposes to extend the service life of four existing bridges by repairing their corroded steel shell piers. The corroded steel shell piers will be encased with reinforced concrete from the top of the pier to four feet below the mudline at three canal bridges in Fresno County and one canal bridge in Kern County. The four bridges to be rehabilitated include the Colony Main Canal Bridge (Number 42-0031 ), Helm Canal Bridge (Number 42-0033), Paso Canal Bridge (Number 42-0034) and Main Drain Canal Bridge (Number 50-0013).

Contact Information
Som Phongsavanh
California Department of Transportation
855 M Street, Suite 200
Fresno, CA 93721

Phone : (559) 445-6447

Location

Counties
Fresno Kern
Other Location Info
SR 33 in Fresno County at post miles 70.63, 72.81, 75.95 and SR 58 in Kern County at post mile 27.82

Notice of Determination

Approving Agency
California Department of Transportation
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Caltrans District 6 office at 1352 West Olive Avenue Fresno CA 93728

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Environmental Document
PileRepairatFirebaugh and ButtonwillowBridges-FocusedIS-FED-06-0U000mbADA_041720 (003)   PDF 12577 K
Notice of Determination
2020019059_Pile Repair at Firebaugh and Buttonwill Bridges   PDF 1885 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print