Auburn Ravine Force Main Replacement Project

2 Documents in Project

Summary

SCH Number
2019119086
Lead Agency
Placer County
Document Title
Auburn Ravine Force Main Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
2/3/2020

Document Description
The proposed project includes replacing a 5,575-foot long, 12-inch diameter asbestos cement wastewater force main with a new 14-inch high density polyethylene pipeline within the roadway right-of-way of Marguerite Mine Road and Auburn Ravine Road. The pipe currently conveys wastewater from the Auburn Ravine Lift Station to a gravity manhole on the State Route 49 trunk sewer line via Auburn Ravine Road and Marguerite Mine Road. The pipe will be installed using open trench construction entirely within the existing paved roadway right-of-way. Horizontal directional drilling will be used to cross under two drainages that cross Auburn Ravine Road.

Contact Information
Christina Hanson
Placer County, Department of Public Works
3091 County Center Drive
Auburn, CA 95603

Phone : (530) 886-4965

Location

Cities
Auburn
Counties
Placer
Regions
Unincorporated
Other Location Info
The proposed project is located within the roadway right-of-way of Marguerite Mine Road and Auburn Ravine Road within the City of Auburn and unincorporated Placer County, California. The pipeline alignment is proposed to extend southeast along Marguerite Mine Road from near the intersection of State Route 49 to the intersection of Auburn Ravine Road. The pipeline alignment would continue east along Auburn Ravine Road to the Auburn Ravine Lift Station located directly east of the Auburn Ravine Road/Appian Way intersection.

Notice of Determination

Approving Agency
Placer County
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Placer County Department of Public Works, 3091 County Center Drive, Auburn CA 95603

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
2019119086_ARFM NOD and Receipt 02-03-2020   PDF 1187 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print