San Quentin Pump Station Replacement Project
2 Documents in Project
Summary
SCH Number
2019119034
Lead Agency
City of San Rafael
Document Title
San Quentin Pump Station Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
1/30/2020
Document Description
Project plans involve replacement of the deteriorated San Quentin Pump Station, demolition of the existing station, and improvements to the outfall pipe that extends from the pump station to San Rafael Bay. Development of the new pump station requires removal of existing corrugated metal pipe, riprap rock, base rock, and asphalt and concrete pavement directly to the south of the existing station. This would be followed by installation of a concrete slab to be placed partially over the area of removed rock and concrete adjacent to the existing station. Once the new pump station is operational, the existing station would be removed and disposed of.
Contact Information
Name
Theo Sanchez
Agency Name
City of San Rafael Dept. of Public Works
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
City of San Rafael Public Works Department
Contact Types
Project Applicant
Location
Cities
San Rafael
Counties
Marin
Cross Streets
111 Morphew Street, San Rafael, CA 94901, CA (Marin County)
Notice of Determination
Approving Agency
City of San Rafael
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.