Final Initial Study/Mitigated Negative Declaration for the Karnak Pump Station Erosion Repair and Debris Screen Retrofit Project (Proposed Project)

3 Documents in Project

Summary

SCH Number
2019109100
Lead Agency
Reclamation District 1500
Document Title
Final Initial Study/Mitigated Negative Declaration for the Karnak Pump Station Erosion Repair and Debris Screen Retrofit Project (Proposed Project)
Document Type
NOD - Notice of Determination
Received
Posted
2/4/2020
Document Description
The District's Proposed Project would consist of: (1) installing approximately 320-feet of new sheet pile wall along the south bank of the canal to remediate the erosion of the canal bank; (2) placement of approximately 500 tons of drainrock and approximately 130 cubic yards of topsoil backfill behind the sheet pile wall; (3) removal and replacement of approximately 350-feet of existing chain-link fence; (4) installation of 9 new 10-foot wide automatic conveyor-belt style debris removal screens to replace the existing debris catchment system; and (5) implementation of seeding and erosion control measures. The site of the undertaking consists of an existing pump station (approximately 0.7 acres) and existing drainage canal located on District-owned land. All project staging activities would take place within developed areas adjacent to the canal.

Contact Information

Name
Brad Mattson
Agency Name
Reclamation District 1500
Contact Types
Lead/Public Agency

Location

Cities
See NOD for full project location
Counties
Sutter

Notice of Determination

Approving Agency
Reclamation District Number 1500
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print