Sac CMS
Summary
SCH Number
2019088072
Public Agency
California Department of Transportation, District 3
Document Title
Sac CMS
Document Type
NOE - Notice of Exemption
Received
Posted
8/21/2019
Document Description
This project will install a CMS & CCTV on northbound Route 160. Approximately 6.8 miles south of Junction Route 160/12. A paved maintenance vehicle pullout will also be provided. Per Std Plan S 116, the CMS will have a CIDH Pile foundation (approximately 5' diameter & 31 ' long) and the CCTV will have a CIDH Pile foundation (approximately 3.5' diameter & 15' long). Power conduit will be installed by trenching about 150 feet long 6" wide and 30" deep trench. A subsurface investigation (drilling) will be performed by the Office of Geotechnical Design-North (OGDN) to determine the subsurface conditions for the sign/camera foundations. The drilling tentatively scheduled to be done in mid-September 2019
Contact Information
Name
Masum A Patwary
Agency Name
Caltrans Dist. 03
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
California Department of Transportation
Contact Types
Project Applicant
Location
Cities
Sacramento
Counties
Sacramento
Other Location Info
Northbound Route 160, approximately 3.3 miles south of Junction Route 160/12.
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Class 1 PRC 21084 title 14 CCR § 15301(b)
Reasons for Exemption
N/A
Attachments
Notice of Exemption
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.