NIPA PCL 56 - Recess Self Storage, PL#17-0105

2 Documents in Project

Summary

SCH Number
2019049085
Lead Agency
Roseville, City of (City of Roseville)
Document Title
NIPA PCL 56 - Recess Self Storage, PL#17-0105
Document Type
NOD - Notice of Determination
Received
Posted
5/23/2019
Project Applicant
Larry Thom, American Recess, LLC

Document Description
The project includes a self-storage facility and industrial flex buildings; the entire site will be graded. The project includes construction of a 115,065-square-foot self-storage facility consisting of one three-story building (a portion would be climate controlled), two 2-story buildings, and five parking spaces. Thirteen existing parcels will be merged and resubdivided into three parcels, one of which will be for the self storage, and the other two for the industrial buildings. The project also includes construction of a 47,060 square-foot industrial flex facility consisting of two single-story buildings with roll-up doors, 86 parking spaces, a loading dock. Both areas will include the associated landscaping, lighting, and drive aisles.

Contact Information
Shelby Vockel
City of Roseville
311 Vernon Street
Roseville, CA 95678

Phone : (916) 746-1347

Location

Cities
Roseville
Counties
Placer
Other Location Info
The project site is located at 8405 Washington Boulevard, on the west side of Washington Boulevard, approximately 1,500 feet south of the intersection of Washington Boulevard and Roseville Parkway in the North Industrial Plan area of the City of Roseville.

Notice of Determination

Approving Agency
City of Roseville
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
The environmental documentation and record of project approval may be examined at the City of Roseville, Office of the City Clerk, 311 Vernon Street, Roseville, CA 95678; Monday-Friday, 8 a.m. to 5 p.m. (916-774-5263).

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
2019049085   PDF 684 K
Download CSV New Search