Potrero Fire Station Relocation Project

2 Documents in Project

Summary

SCH Number
2019049058
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Potrero Fire Station Relocation Project
Document Type
NOD - Notice of Determination
Received
Posted
6/12/2019
Document Description
The Proposed Project would involve the relocation and replacement of the existing CAL FIRE Station located at 25130 CA-94, Potrero, California. The project involves design and construction of a new fire station and accompanying facilities. The facility would include a mess hall, 12 bed barracks, a three-bay apparatus building, and a pump storage building with a generator. Appurtenance facilities to be constructed on the new project site include a fuel dispensing system, fuel vault, vehicle wash rack, and a flammable material storage building. The Proposed Project would also include on-site improvements such as grading, drainage, paving, walkways, curbs, roads, well drilling and domestic water system with tank storage, septic system, electrical, telephone, irrigation, lighting, fencing, and landscaping.

Contact Information

Name
Stephanie Coleman
Agency Name
State of California Department of Forestry and Fire Protection
Contact Types
Lead/Public Agency

Location

Cities
Potrero
Counties
San Diego
Regions
Unincorporated
Parcel #
653-100-21
Other Location Info
The Project is located on Round Potrero Road in the unincorporated community of Potrero, California 91963, approximately one mile north of CA-94.

Notice of Determination

Approving Agency
CAL FIRE
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print