Parlier 1, 2, 3 TCP Removal Treatment System
5 Documents in Project
Summary
SCH Number
2019039162
Lead Agency
City of Parlier
Document Title
Parlier 1, 2, 3 TCP Removal Treatment System
Document Type
ADM - Addendum
Received
Present Land Use
Existing roadways, vacant land with no vegetation
Document Description
The City of Parlier intends to construct a water treatment system designed to remove 1,2,3-Trichloropropane (TCP) from the water system due to levels above State Water Board maximum permitted levels. This includes construction and installation of treatment trains, connecting pipelines, and related equipment. The project will occur on the existing water distribution system. The Addendum was prepared to address minor changes that were made to the project description after the MND was adopted by the City in May of 2019. The Addendum addresses installation and operation of an additional TCP treatment facility at Well #8 (Location 4) in the City as well as the addition of approximately 300 feet of pipeline that will be installed from South Milton Avenue to the proposed TCP treatment facility located north of Well #2A.
Contact Information
Name
Sonia Hall
Agency Name
City of Parlier
Contact Types
Lead/Public Agency
Phone
Email
Name
Agency Name
City of Parlier
Contact Types
Project Applicant
Location
Cities
Parlier
Counties
Fresno
Regions
Citywide
Cross Streets
City-wide / multiple locations
Zip
93648
Parcel #
various
Schools
multiple
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Transportation, District 6 (DOT), California Department of Water Resources (DWR), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), Central Valley Flood Protection Board, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Water Facilities (TCP Removal system)(Type TCP Removal , MGD N/A)
Local Actions
Other
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Vegetation, Wetland/Riparian, Wildfire, Wildlife
Attachments
Environmental Document
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.