Amendment to the Water Quality Control Plan for the Sacramento and San Joaquin River Basins for the Control of Pyrethroid Pesticide Discharged

2 Documents in Project

Summary

SCH Number
2019039047
Lead Agency
Regional Water Quality Control Board, Region 5 (Central Valley)
Document Title
Amendment to the Water Quality Control Plan for the Sacramento and San Joaquin River Basins for the Control of Pyrethroid Pesticide Discharged
Document Type
NDE - Notice of Decision
Received
Posted
3/7/2019

Document Description
The project is an Amendment to the Water Quality Control Plan for the Sacramento and San Joaquin River Basins that establishes a control program, including a conditional prohibition of discharges and Total Maximum Daily Loads to protect water bodies in the Sacramento and San Joaquin Valleys from impairment due to discharges of pyrethroid pesticides associated with uses of these pesticides in agricultural operations and in urban areas. The goal of the Amendment is to reduce pyrethroid pesticide concentrations in Sacramento and San Joaquin Valley water bodies to levels that are protective of aquatic life (WARM and/or COLD) beneficial uses.

Contact Information
Daniel McClure
RWQCB Central Valley
11020 Sun Center Drive, #200
Rancho Cordova, CA 95670

Phone : (916) 464-4751

Location

Other Location Info
The Project Area is the Sacramento and San Joaquin River watersheds.

Notice of Determination

Approving Agency
CV RWQCB
Approved On
Final Environmental Document Available at
N/A

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Attachments

Notice of Determination
2019039047   PDF 77 K
Download CSV New Search