Mattole Headwaters Flow Enhancement Project

6 Documents in Project

Summary

SCH Number
2018122046
Lead Agency
Humboldt County
Document Title
Mattole Headwaters Flow Enhancement Project
Document Type
NOD - Notice of Determination
Received
Posted
8/30/2022
Document Description
The South Fork Lost River Flow and Habitat Enhancement Project includes construction of a stage 0 wetland, off-channel terrace pond, and 400 feet of instream channel-spanning structures. The total project area is approximately 24 acres in size and the features are designed to enhance instream habitat and flows in one mile of Lost River and 0.6 miles of the Mattole mainstem, as well as increase groundwater storage, to benefit endangered coho salmon. WCB Project Tracker ID: 2022028.

Contact Information

Name
John P. Donnelly
Agency Name
Department of Fish and Wildlife, Wildlife Conservation Board
Job Title
Executive Director
Contact Types
Responsible Agency

Location

Cities
Near the town of Whitethorn
Counties
Mendocino
Regions
Northern California
Other Location Info
The specific project site under this MND to be funded by WCB is on a forested reach of the South Fork Lost River, a tributary to the Mattole River headwaters in Mendocino County. The Lost River watershed is located approximately 21 road miles southwest of Garberville and Highway 101, near the town of Whitethorn.

Notice of Determination

Approving Agency
Department of Fish and Wildlife, Wildlife Conservation Board
Approving Agency Role
Responsible Agency
Approved On
County Clerks
Humboldt, Mendocino
Final Environmental Document Available at
3015 H st. Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print