Recycled Water Easterly Agriculture Distribution System

3 Documents in Project

Summary

SCH Number
2018111035
Lead Agency
City of Escondido
Document Title
Recycled Water Easterly Agriculture Distribution System
Document Type
NOD - Notice of Determination
Received
Posted
11/23/2020
Document Description
The Project includes installation of approximately 2.20 linear miles of 8-inch to 20-inch diameter recycled water pipeline to distribute recycled water to the growers surrounding the City's above-ground, 1.2 million-gallon Hogback Reservoir tank; installation of new recycled water meters of approximately the same size as existing irrigation meters, including new irrigation piping from the new meters to connect the existing irrigation system to the recycled water supply; and existing potable water connections and meters would be disconnected from the irrigation system but would remain in place for future uses.

Contact Information

Name
Cedric Irving
Agency Name
State Water Board
Contact Types
Lead/Public Agency

Name
Agency Name
City of Escondido
Contact Types
Project Applicant

Location

Cities
Escondido
Counties
San Diego
Other Information
Project site is located in unincorporated San Diego County land and within the City of Escondido’s (City) Sphere of Influence, generally located east of the City and south of Mountain View Road, northwest of the State Route (SR) 78 and east of the intersection of Cloverdale Road and Rockwood Road.

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print