PG&E Vegetation Management Minor Use Permit/Coastal Development Permit; DRC2016-00135
3 Documents in Project
Summary
SCH Number
2018101018
Lead Agency
San Luis Obispo County
Document Title
PG&E Vegetation Management Minor Use Permit/Coastal Development Permit; DRC2016-00135
Document Type
NOD - Notice of Determination
Received
Posted
1/15/2019
Present Land Use
Ag
Document Description
Request by PG&E for a minor use/coastal development permit to allow PG&E to perform vegetation maintenance (e.g., removing trees and brush) within PG&E's existing ROW in three areas that contain high-pressure natural gas transmission pipelines. Vegetation management is proposed to improve emergency access and for safety concerns. PG&E proposes to remove woody vegetation within 5 ft of the outer edge of gas pipeline 306 and remove trees out to 14 ft at 3 sites: RW-V-518-13N, RW-V-523-13, and RW-V-518-13S. All herbaceous vegetation within the sites would be retained. Approx 36 trees and 38 brush units (one brush unit equals 264.20 cubic ft, for a total of approx 10,000 cubic feet of brush) of mixed species would be removed from three waterways, and approximately four willow trees would be pruned. The project sites are within the Agriculture land use category.
Contact Information
Name
Vick Germany
Agency Name
San Luis Obispo County
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Morro Bay
Counties
San Luis Obispo
Cross Streets
SR 41 and Atascadero Rd, Little Morro Creek Rd
Zip
93402
Total Acres
0.25
Parcel #
073-085-027, -084-013, -051-
Schools
San Luis Coastal USD
Waterways
Morro Creek, Little Morro Creek
Notice of Determination
Approving Agency
San Luis Obispo County Planning & Building Dept.
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.