Caselman South Subdivision
3 Documents in Project
Summary
SCH Number
2018092005
Lead Agency
Sacramento County
Document Title
Caselman South Subdivision
Document Type
NOD - Notice of Determination
Received
Posted
4/5/2022
Document Description
The project is limited to installation of a detention basin outfall as a part of the development of a residential subdivision. The detention basin outfall improvements include installation of a 36-inch diameter reinforced concrete pipe (or high-density polyethylene pipe) within a 3-foot, 10-inch concrete headwall per Sacramento County Standard Drawing 9-26H and trash rack per Sacramento County Standard Drawing 9-26G. A 70-foot-long concrete overflow weir will be constructed in upland areas to
connect the outfall with a newly constructed detention basin. The drainage outfall improvements will be constructed in an existing concreted portion of Beacon Creek and will occur during summer-fall months when there is no water in Beacon Creek.
Contact Information
Name
Dylan Wood
Agency Name
Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Coordinates
Cities
Sacramento
Counties
Sacramento
Regions
Northern California
Parcel #
115-0091-057-0000
Other Location Info
The project is located at Beacon Creek in the Vineyard community of unincorporated
Sacramento County. The project is generally located at 8680 Caselman Road in Sacramento, CA 95828.
Notice of Determination
Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
the office location listed above for the Lead Agency. CDFW’s record of execution of the Streambed Alteration Agreement as Responsible Agency is available at CDFW’s regional office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.