State Route 74 Safety Improvements Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2018091006
- Lead Agency
- Caltrans, District 12 - Orange (California Department of Transportation, District 12)
- Document Title
- State Route 74 Safety Improvements Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/12/2020
- Project Applicant
- CA Dept of Transportation (Caltrans) District 12
- Document Description
- The Applicant proposes to restore existing non-standard shoulders to a continuous 4-foot shoulder on the west side of the San Juan Canyon Bridge, improve the superelevation at the San Juan Fire Station, and improve the existing drainage system to collect off-site runoff and prevent it from flowing onto the roadway. The Project will modify drainage facilities by installing new and reconstructing existing culverts. Drainage modifications will occur at 10 locations that are tributary to San Juan Creek.
- Contact Information
-
Darren Bradford
RWQCB - San Diego Region
2375 Northside Drive
San Diego, CA 92108
Phone : (619) 521-3356
Location
- Counties
- Orange Riverside
- Other Location Info
- Hwy 74, 0.8 mile west of San Juan Hot Springs Cyn to Orange/Riverside Cty line
Notice of Determination
- Approving Agency
- RWQCB - San Diego Region
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- Enter the CEQA Doc website and Certification No. R9-2020-0153 can be found at: https://ceqanet.opr.ca.gov/2018031005
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- Yes
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- 2018091006_SR-74 PDF 250 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.