Halton Canyon Sewer Replacement Project

2 Documents in Project

Summary

SCH Number
2018081016
Lead Agency
Carmel Area Wastewater District (CAWD)
Document Title
Halton Canyon Sewer Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/26/2018
Present Land Use
Land Use - Hatton Canyon Park and CAWD Easement/No zoning or general plan designation
Document Description
CAWD proposes to replace an approximately 5,600-foot section of an existing, 8-inch diameter vitrified clay sewer pipeline with a 10-inch high density polyethylene pipeline in Hatton Canyon. The proposed project is required to reduce the risk of sanitary sewer overflow, reduce inflow, and infiltration and simply maintenance. The modifications will only occur within the California Department of State Parks property over which CAWD has legal easement, and as proposed will have no unmitigated impact on the fish, wildlife, or human beings. The incremental modifications contained in the Project will not change the cumulative existing impact of the pipeline on the environment.

Contact Information

Name
Patrick Treanor
Agency Name
Carmel Area Wastewater District (CAWD)
Contact Types
Lead/Public Agency

Location

Cities
Carmel-by-the-Sea
Counties
Monterey
Cross Streets
Carmel Valley Road and Highway 1
Zip
93923
Total Acres
3.4
State Highways
1, 68
Schools
Carmel High School
Waterways
Hatton Canyon Stream, Carmel River

Notice of Determination

Approving Agency
Carmel Area Wastewater District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print