SCH Number 2018081016


Project Info

Title
Halton Canyon Sewer Replacement Project
Description
CAWD proposes to replace an approximately 5,600-foot section of an existing, 8-inch diameter vitrified clay sewer pipeline with a 10-inch high density polyethylene pipeline in Hatton Canyon. The proposed project is required to reduce the risk of sanitary sewer overflow, reduce inflow, and infiltration and simply maintenance. The modifications will only occur within the California Department of State Parks property over which CAWD has legal easement, and as proposed will have no unmitigated impact on the fish, wildlife, or human beings. The incremental modifications contained in the Project will not change the cumulative existing impact of the pipeline on the environment.
Download CSV New Search

 

2 documents in project

Type Lead Agency Received Title
Carmel Area Wastewater District (CAWD) Halton Canyon Sewer Replacement Project
Carmel Area Wastewater District (CAWD) Halton Canyon Sewer Replacement Project

Disclaimer: Summaries of the notices may take several days to appear on CEQAnet. Again, the publishing of information on CEQAnet does not factor into when such notices were received and posted by the SCH. Contact the SCH for copies of an NOE or NOD that has been posted at OPR.