San Joaquin Culverts Project State Route - 4, Post Mile 3.4 (Lake or Streambed Alteration Agreement No. 1600-2019-0244-R3)

5 Documents in Project

Summary

SCH Number
2018072030
Lead Agency
Caltrans, District 6 - Fresno/Bakersfield (California Department of Transportation, District 6)
Document Title
San Joaquin Culverts Project State Route - 4, Post Mile 3.4 (Lake or Streambed Alteration Agreement No. 1600-2019-0244-R3)
Document Type
NOD - Notice of Determination
Received
Posted
2/5/2020
Project Applicant
California Department of Transportation

Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2019-0244-R3, pursuant to section 1602 of the Fish and Game Code to the California Department of Transportation as represented by Allen Lao. The Project is limited to the replacement of a previously existing 36-inch diameter, 94-foot-long, corrugated metal pipe (CMP) culvert with a 48-inch diameter, 91-foot-long, reinforced concrete pipe (RCP). Approximately 200, 4-foot-wide by 20-foot-long, interlocking steel sheet piles will be installed from the top of roadway using a vibratory hammer attached to a backhoe. The piles will be driven 8 to 10 feet deep to create a 1,000 square foot coffer dam on both sides of the roadway around each end of the culvert. The existing 36-inch diameter by 94-foot-long CMP will be excavated and removed and disposed of off-site. The roadway excavation will be lined with a thin layer of¾ inch clean gravel to total 5 cubic yards to create a bed for the new culvert. A new 48 inch by 91-foot-long pre-cast RCP will be placed on the gravel bed by connecting 18, 5-foot-long segments. The pipe will then be backfilled with 80 cubic yards of concrete slurry and 1,440 cubic yards of roadway excavated material.

Contact Information
Robert Stanley
Department of Fish and Wildlife
2825 Cordelia Road, Suite 100
Fairfield, CA 94534

Phone : (707) 428-2093

Location

Counties
San Joaquin
Other Location Info
The Project is located along State Route 4 at Post Mile 3.4 along State Route 4 (SR-4) in San Joaquin County in the State of California.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
The negative declaration prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFWs record related to the Lake or Streambed Alteration Agreement is available to the public for review at CDFWs regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
2018072030_NOD 2019-0244   PDF 439 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.