39 Kirkpatrick Drive 5-Lot Subdivision-Vesting Tentative Map

2 Documents in Project

Summary

SCH Number
2018052067
Lead Agency
California Department of Conservation (DOC)
Document Title
39 Kirkpatrick Drive 5-Lot Subdivision-Vesting Tentative Map
Document Type
NOD - Notice of Determination
Received
Posted
8/13/2018
Present Land Use
Vacant - Residential/ R-7 Single-Family Residential District/Single-Family Residential High Density
Document Description
The applicant is requesting approval of a 5-lot Vesting Tentative Map. The proposed tentative map identifies 5 lots ranging in size from 8,250 to 12,346 sq. ft. in area. The project includes a variance request for a 0-foot setback where 20 feet is required for the purposes of constructing a 5-foot tall retaining wall on/between lots #4 and #5. 1,050 total cubic yards of soil will be graded and balanced on-site in order to create the building pads, roadway and related subdivision improvements. The removal of 14 trees and work within the dripline of 7 other trees will be necessary to construct the project. The project also includes an exemption request from County Ordinance Code, Division 914, Chapter 914-2.004 to be relieved of the off-site collect and convey requirements. The subject property is located at 39 Kirkpatrick Drive in the El Sobrante area (Zoning: R-7 Single-Family Residential District) (Parcel Numbers: 430-161-020 and 021).

Contact Information

Name
Jit S Pandher
Agency Name
Department of Conservation
Contact Types
Lead/Public Agency

Location

Counties
Contra Costa
Cross Streets
Kirkpatrick Dr and Argyle Rd
Zip
94803
Total Acres
1.12
Parcel #
430-161-020, -021
State Highways
80
Schools
Sunshine Playschool

Notice of Determination

Approving Agency
Contra Costa County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print