West Modesto Sewer Infrastructure Project

4 Documents in Project

Summary

SCH Number
2018052010
Lead Agency
Stanislaus County
Document Title
West Modesto Sewer Infrastructure Project
Document Type
NOD - Notice of Determination
Received
Posted
7/23/2018
Present Land Use
low density res, medium density res, commercial, and city
Document Description
The Beverly/Waverly neighborhood is located approx. 0.9 mile west of Hwy 99 and is accessible from Paradise Road. The Rouse/Colorado neighborhood is located approx. 0.6 mile west of Hwy 99 and is accessible from Tuolumne Blvd and Roselawn Avenue. The following street intersections and road segment are part of the project site; the CA/Marshall Avenue intersection; Paradise Road/Pine Tree intersection; and approx. 100' east of the Lombardy Drive/Ritsch Lane Intersection. The Spencer/Marshall, Beverly/Waverly, and Rouse/Colorado neighborhoods are disadvantaged communities located in west Modesto with predominantly residential parcels that currently rely on septic tanks of the treatment of sewage. The project is proposed in response to health and safety concerns associated with failing septic systems which could lead to the degradation of groundwater quality. The project will include the installation of a new sewer system with approx. 80,000 linear feet of sewer main and street reconstruction. The completed project will allow property owners to abandon their existing septic tanks and connect to a public sewer system. Upon completion of the project, project ownership will be transferred to the City of Modesto for operation and maintenance. Existing private septic systems and water services will remain active during project construction. No road closures are anticipated to occur and access to each residence will be maintained. Minor temporary detours for local traffic may take place. Temporary construction easements, utility easements, and encroachment permits may be needed on a limited basis to accommodate the installation of the proposed improvements. Construction for the Spencer/Marshall area is anticipated to last six months, for the Beverly/Waverly area eighteen months, and for the Rouse/Colorado area twelve months.

Contact Information

Name
Miguel A. Glavez
Agency Name
Stanislaus County
Contact Types
Lead/Public Agency

Location

Cities
Modesto
Counties
Stanislaus
Cross Streets
Beverly Dr/Waverly Dr, Rouse Ave/Colorado Ave, and Spencer Ave/Marshall Ave
Zip
95354
Total Acres
419
Parcel #
mult
State Highways
132, 99
Schools
Mult
Waterways
Stanislaus River
Township
3S
Range
9E
Section
31

Notice of Determination

Approving Agency
Stanislaus County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print