Rehabilitation and Expansion of Lenain Water Treatment Plant

4 Documents in Project

Summary

SCH Number
2018031046
Lead Agency
Anaheim, City of (City of Anaheim)
Document Title
Rehabilitation and Expansion of Lenain Water Treatment Plant
Document Type
NOD - Notice of Determination
Received
Posted
5/22/2018
Present Land Use
water treatment plant

Document Description
The following activities are proposed as part of the project. The proposed improvements at the Plant and the Reservoir are grouped into the following categories: Boat Ramp Rehabilitation; New Reservoir Outlet Structure Building; Reservoir Outlet Structure Valve Replacement; Periphery Road Improvements; Secondary Access Road and Pipeline Improvements; Electric Vehicle Charging Stations; New Backup Generator; Bypass Structure Valve, Slope, and Drainage improvements; North Inlet Structure Manhole and Valve Replacements; Plant Process Improvements; Washwater Recovery Facility; Access Road improvements; Chemical Storage and Feed Facilities.

Contact Information
Dena Giacomini
City of Anaheim
201 S. Anaheim Boulevard,
Anaheim, CA 92805

Phone : (714) 765-4166

Location

Coordinates
33°50'18.5"N 117°45'16.8"W
Cities
Anaheim
Counties
Orange
Cross Streets
6751 East Walnut Canyon Rd
Zip
92805
Total Acres
1.80
Parcel #
08559103
State Highways
91
Schools
Anaheim Hills ES
Waterways
Santa Ana River
Township
4S
Range
8W
Section
NE
Base
SB

Notice of Determination

Approving Agency
City of Anaheim
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
http://www.anaheim.net/507/Current-Environmental-Review

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print