Former PureGro Facility Remedial Action Plan
3 Documents in Project
Summary
SCH Number
2018011034
Lead Agency
California Department of Toxic Substances Control
(DTSC)
Document Title
Former PureGro Facility Remedial Action Plan
Document Type
NOD - Notice of Determination
Received
Posted
6/4/2020
Document Description
The Project involves remediation of the former PureGro Facility property to meet commercial/industrial and residential risk-based criteria. Specifically, work will include targeted excavation on the property and within a residential buffer zone on the eastern border, landscaping of the southern border residential buffer zone, soil stockpile removal, placement of an engineered cover over the entire 11-acre site (i.e., site's entirety north of the southern fence line), establishment of institutional controls, adoption of a monitoring and maintenance plan, adoption of a Land Use Covenant and groundwater monitoring.
Project construction activities are anticipated to occur over a 16-month period beginning in the Fall of 2020. There will be a 5-month hiatus in mid-2021 (if required) for a total of 11 months of active construction. The Project site is zoned as Light Manufacturing (M-1 ). The adjacent land uses include Light Manufacturing, Low-Density Residential, and a municipal airport.
Contact Information
Name
Edward Morelan
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Address
Phone
Name
Agency Name
Chevron Environmental Management Company
Contact Types
Project Applicant
Location
Counties
Imperial
Cross Streets
1025 River Drive, Brawley, Imperial County, CA
Notice of Determination
Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.