Pacheco Boulevard Sidewalk Gap Closure Phase III

2 Documents in Project

Summary

SCH Number
2017118136
Lead Agency
Contra Costa County
Document Title
Pacheco Boulevard Sidewalk Gap Closure Phase III
Document Type
NOE - Notice of Exemption
Received

Document Description
The purpose of this Project is to install pedestrian infrastructure that will close two short gaps in the sidewalk along Pacheco Boulevard east of Las Juntas Elementary School. The first sidewalk gap (Site 1) is approximately 70 feet long and is located at the Vine HIll Creek crossing. The second sidewalk gap (Site 2) is approximately 65 feet long and located at the Vine Hill Creek. The proposed improvements will provide an Americans with Disabilities Act (ADA) accessible sidewalk and increase the roadway shoulder width to accommodate a Class II bike lane and parking. The Project consists of extending the existing 8 foot x 7 foot concrete box culvert where Vine Hill Creek flows under Pacheco Boulevard to be widened approximatly 27 feet, which would allow for the continuation of the bike lane, parking lane, and sidewalk to be constructed across Vine HIll Creek.

Contact Information
Alex Nattkemper
Contra Costa County
30 Muir Road
Martinez, CA 94553

925 313-2364

Location

Counties
Contra Costa
Other Location Info
Unincorporated Community of Vine Hill

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301 - Class 1(c)
Reasons for Exemption
The Project consists of minor alteration of existing public facilities, involving negligible expansion of use beyond that previously existing.
Download CSV New Search