Potrero Power Staton Mixed-Use Development Project

2 Documents in Project

Summary

SCH Number
2017112005
Lead Agency
San Francisco, City and County of (City and County of San Francisco)
Document Title
Potrero Power Staton Mixed-Use Development Project
Document Type
EIR - Draft EIR
Received

Document Description
Note: See EIR for full project description. The Potrero Power Station Mixed-Use Development Project is located on an approx 29.0-acre site along San Francisco's central bayshore waterfront, encompassing the site of the former Potrero Power Plant that closed in 2011. California Barrel Company LLC, the project sponsor, seeks to redevelop the site for a proposed multi-phased, mixed use development, and activate a new waterfront open space. The proposed project would rezone the site, establish land use controls, develop design standards, and provide for development of residential, commercial [including office, R&D/life science, retail, hotel, and PDR, parking, community facilities, and open space land uses. The proposed project would include amendments to the GP and Planning Code, creating a new Potrero Power Station Special Use District. The proposed rezoning would modify the existing height limits of 40 and 65 ft to various heights ranging from 65-300 ft. Overall, the proposed project would construct up to approx 5.3 M gsf, of uses, including between approx 2.4 and 3.0 M gsf of residential uses (~2,000 to 3,000 dwelling units), between approx 1.2 and 1.9 M gsf of commercial facilities. Most new buildings would range in height from 65-180 ft, with one building at 300 ft. Approx 6.3 acres would be devoted publicly accessible open space.

Contact Information
Rachel Schuett
City and County of San Francisco
1650 Mission St, Suite 400
San Francisco, CA 94103-2479

(415) 575-9030

Location

Coordinates
37°45'20.4"N 122°23'06.4"W
Cities
San Francisco
Counties
San Francisco
Cross Streets
Illinois St and 23rd St
Zip
94107
Total Acres
28.8
Parcel #
4175/lot 002, block 4175/lot 017, block 4175/lot 018, block 4232/lot001, blcok 4232/lot006
State Highways
I-280, US 101, I-80
Railways
Caltrain
Schools
SFUSD, Potrero Terrace
Waterways
SF Bay, Islais Creek Channel, Mission Creek

Notice of Completion

Review Period Start
Review Period End
Development Type
Residential (2,682 Units) Office (1,289 k Sq. Ft., 3,923 Employees) Commercial (209k Sq. Ft., 740 Employees) Recreational (6.3 acres) Water Facilities (rec dock Type) Other (100,938 gsf community facilities, 946,981 gsf parking, 6.3 acres)
Local Action
Other Action Subdivision Rezone General Plan Amendment Other Action: Sp UseDist
Project Issues
Cumulative Effects Landuse Growth Inducing Wetland/Riparian Water Supply Water Quality Vegetation Traffic/Circulation Toxic/Hazardous Solid Waste Soil Erosion/Compaction/Grading Sewer Capacity Schools/Universities Recreation/Parks Public Services Population/Housing Balance Noise Minerals Geologic/Seismic Forest Land/Fire Hazard Flood Plain/Flooding Economics/Jobs Drainage/Absorption Biological Resources Archaeologic-Historic Air Quality Agricultural Land Aesthetic/Visual
Reviewing Agencies
Caltrans, District 4 Air Resources Board, Major Industrial Projects Cal Fire California Coastal Commission California Department of Parks and Recreation California Energy Commission California Highway Patrol California Public Utilities Commission Department of Fish and Wildlife, Region 3 Department of Housing and Community Development Native American Heritage Commission Office of Emergency Services, California Regional Water Quality Control Board, Region 2 Resources Agency San Francisco Bay Conservation and Development Commission
Download CSV New Search