Point Pinos Coastal Trail Improvement Project

3 Documents in Project

Summary

SCH Number
2017101022
Lead Agency
City of Pacific Grove
Document Title
Point Pinos Coastal Trail Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
4/19/2021
Document Description
Proposed project is development of a 5-ft wide decomposed granite surfaced ADA accessible coastal trail within a natural setting seaward of Ocean View Blvd., along approx. 0.8 miles of coastline in Pacific Grove. The coastal trail will connect from the existing curbside trail near Acropolis St west to the Great Tidepool site. Project locates the trail outside the 30-yr. coastal retreat setback line, except where moving the trail beyond this line is constrained by Ocean View Blvd. In these cases, the trail will be along the north side of the road, such as along Crespi Pond. Constructing the trail beyond the setback line will require removal or relocation of many of the existing informal DG parking areas along the shoreline. Another project component is to move parking beyond the 30-yr. setback line with a goal to avoid net loss of parking.

Contact Information

Name
Evelyn Maginnity
Agency Name
Natural Resources Agency
Contact Types
Responsible Agency

Location

Cities
Pacific Grove
Counties
Monterey
Cross Streets
Ocean View Blvd., Asilomar Ave. & Acropolis St.
Zip
93950

Notice of Determination

Approving Agency
California Natural Resources Agency
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Monterey
Final Environmental Document Available at
City of Pacific Grove Public Works Department, 2100 Sunset Dr., Pacific Grove, CA 93950

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print