Point Pinos Coastal Trail Improvement Project

3 Documents in Project

Summary

SCH Number
2017101022
Lead Agency
City of Pacific Grove
Document Title
Point Pinos Coastal Trail Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
12/13/2017
Present Land Use
open space recreational
Document Description
The proposed project is development of a 5-ft wide decomposed granite surfaced coastal trail within a natural setting seaward of Ocean View Blvd, along approx. 0.8 mile of coastline, in the city of Pacific Grove. The coastal trail will connect from the existing curb side trail near Acropolis St west to the Great Tidepool site, a distance of approx. 0.8 mile. The project locates the trail outside the 30-year coastal retreat setback line, except where moving the trail beyond this line is constrained by Ocean View Blvd. In these cases, the trail will be along the north side of the road, such as along Crespi Pond. Constructing the trial beyond the setback line will require removal or relocation of many of the existing informal DG parking areas along the shoreline. Another project component is to move parking beyond the 30-year setback line, with a goal to avoid net loss of parking.

Contact Information

Name
Daniel Gho
Agency Name
City of Pacific Grove
Contact Types
Lead/Public Agency

Location

Cities
Pacific Grove
Counties
Monterey
Cross Streets
Ocean View Blvd, Asilomar Ave, Acropolis St
Zip
93950
Total Acres
15
Parcel #
007-011-001, 006-021-99
State Highways
1
Schools
Lighthouse ES
Waterways
Pacific Ocean, Monterey Bay
Township
15S
Range
1E
Base
MDM

Notice of Determination

Approving Agency
City of Pacific Grove
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.