3rd Street and 5th Street Corridor Improvements Project

2 Documents in Project

Summary

SCH Number
2017091028
Lead Agency
City of Highland
Document Title
3rd Street and 5th Street Corridor Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
11/8/2017
Present Land Use
business park, industrial, open space, planned development, public/quasi public, low density res & single fam res
Document Description
The San Manual Band of Mission Indians (Tribe), in conjunction with the Inland Valley Development Agency (IVDA), and the City of Highland (City), desire to improve existing roadway and infrastructure conditions for 3rd Street/5th Street and several intersecting local roadway segments in the City of Highland. Within the project limits, trucks hauling concrete, sand, and gravel - especially along Palm Avenue and 5th Street - heavily use the existing roadway network. These truck loads co-mingle with passenger vehicles on 5th Street, which is one of only two State Route 210 (SR-210) freeway access routes to and from SR-210 for improved circulation in Highland's Business Park and Industrial Districts near the San Bernardino International Airport. Existing roadway Pavement Condition Index (PCI) varies within the Project limits from very poor (39 PCI) to very good (100 PCI). The project improvements will enhance the multi-modal flow of traffic on the area circulation system (vehicle traffic, pedestrian and bicycle) and substantially increase safety on the affected roadways. Upon Project completion all pavement within Project limits will have a PCI of 100. Additionally, there are currently significant gaps in the pedestrian network along the roadways including within the Project. The Project will construct 1.1 miles of new sidewalks and ramps for pedestrian safety and convenience. The project includes the following: removal and reconstruction of existing deteriorated pavements; widening of existing pavements, rehabilitation of existing pavements, intersection realignment, construction of a new intersection, construction of a raised center median, construction of dedicated turn-lanes, traffic signal modifications, construction of storm drain improvements and appurtenances, curbs, gutters, sidewalks, street lights, bike lanes, pavement markings, signage, and routine and ordinary utility adjustments.

Contact Information

Name
Kim Stater
Agency Name
City of Highland
Contact Types
Lead/Public Agency

Location

Cities
Highland
Counties
San Bernardino
Cross Streets
5th St, 3rd St, Palm Ave, Central ve, and Victoria Ave
Zip
92346
Total Acres
25
State Highways
210
Airports
SB Intl
Waterways
City Creek and City Creek Bypass
Township
1S
Range
3W
Section
4,5
Base
SBBM

Notice of Determination

Approving Agency
City of Highland
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print