Waterman Road Rehabilitation and Bike Lanes - Bond Road to Sheldon Road Project

3 Documents in Project

Summary

SCH Number
2017072064
Lead Agency
Elk Grove, City of (City of Elk Grove)
Document Title
Waterman Road Rehabilitation and Bike Lanes - Bond Road to Sheldon Road Project
Document Type
NOD - Notice of Determination
Received
Posted
10/13/2017
Present Land Use
Agriculture-residential, agricultital, commercial/mixed-use

Document Description
Rehabilitate and improve Waterman Rd. between Bond Rd. and Sheldon Rd by resurfacing and widening existing lanes to meet current City rural road design standards. Project will widen each vehicle lane to 11 feet wide, add 6 foot-wide bike lanes along shoulders, and create 1 foot wide shoulder backing. Existing roadside ditches will be relocated to between 5 and 10 feet away from their current position, to accommodate expanded lane widths and shoulders. Project will connect to existing roundabout at the intersection of Sheldon Road and Waterman Road.

Contact Information
Kevin Bewsey
City of Elk Grove
8401 Laguna Palms Way
Elk Grove, CA 95758

Phone : (916) 478-2243

Location

Coordinates
38°25'28"N 121°21'12"W
Cities
Elk Grove
Counties
Sacramento
Cross Streets
Waterman Road, between Bond Street and Sheldon Road
Zip
95624
Total Acres
7.18
Parcel #
Not Applicable
State Highways
99 (within 2.3 miles)
Railways
Union Pacific
Airports
None
Schools
Pleasant Grove High
Waterways
Laguna Creek
Township
7N
Range
6E
Section
29&30
Base
MDB

Notice of Determination

Approving Agency
City of Elk Grove
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
8401 Laguna Palms Way, Elk Grove, CA 95758

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print