Cunningham Flood Detention Facility Certification

3 Documents in Project

Summary

SCH Number
2017072041
Lead Agency
Santa Clara Valley Water District
Document Title
Cunningham Flood Detention Facility Certification
Document Type
NOD - Notice of Determination
Received
Posted
1/22/2018
Present Land Use
open space parklands and habitats
Document Description
The project would raise the existing levee crest elevation and construct a new concrete floodwall along Lower Silver, Flint, and Ruby Creeks within Lake Cunningham Park. The proposed Project would ensure flood detention capability of Lake Cunningham Park, reduce flow hazards to urbanized areas along Lower Silver Creek downstream of Lake Cunningham Park, and provide the Federal Emergency Management Agency (FEMA) required 3 feet of freeboard. In addition, the District proposes to regrade small portions of the existing trail adjacent to the lake, replace perimeter fencing, relocate an existing trash compactor and green waste collection area, and construct a new park entrance as well as pedestrian path.

Contact Information

Name
Tim Tidwell
Agency Name
Santa Clara Valley Water District
Contact Types
Lead/Public Agency

Location

Cities
San Jose
Counties
Santa Clara
Cross Streets
South White Rd and Cunningham Ave
Zip
95148
Total Acres
9
State Highways
101, 680
Airports
Reid-Hillview
Waterways
Lake Cunningham, Lower Silver Ck, Flint Ck, Ruby Ck

Notice of Determination

Approving Agency
Santa Clara Valley Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.