Bello Street Bridge Replacement Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2017071028
- Lead Agency
- Pismo Beach, City of (City of Pismo Beach)
- Document Title
- Bello Street Bridge Replacement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/29/2017
- Present Land Use
- open space; public/semi-public; and industrial
- Document Description
- The city proposes to replace the existing Bello Street Bridge (Bridge # 49C-109) over Pismo Creek with a new bridge and improve the adjacent roadway approaches. The existing Bello Street Bridge consists of a 125-ft long single span steel Pratt through truss structure constructed in 1912-1913. The proposed project would replace the existing structure with a new, 130-ft long, three-span, cast-in-place prestressed concrete slab structure along the existing horizontal alignment. The new bridge width will be 44.5 feet to meet current standards.
- Contact Information
-
Jeff Winklepleck
City of Pismo Beach
760 Mattie Road
Pismo Beach, CA 93449
Phone : (805) 773-4658
Location
- Coordinates
- 35°08'33.9"N 120°37'58.8"W
- Cities
- Pismo Beach
- Counties
- Tulare
- Cross Streets
- Bello St and Frady Lane
- Zip
- 93449
- Total Acres
- 1.92
- State Highways
- US 101
- Railways
- UPRR
- Schools
- Judkins MS
- Waterways
- Pismo Creek
- Township
- 32S
- Range
- 12E
- Section
- 13
- Base
- MDBM
- Other Location Info
- Shell Beach
Notice of Determination
- Approving Agency
- City of Pismo Beach
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 760 Mattie Road, Pismo Beach, CA 93449
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.