Addendum to the Preliminary Master Plan for Former LA Times Site Planning Applications 17-03 A 1 and 19-30, and Zoning Application 18-72

3 Documents in Project

Summary

SCH Number
2017061069
Lead Agency
Costa Mesa, City of (City of Costa Mesa)
Document Title
Addendum to the Preliminary Master Plan for Former LA Times Site Planning Applications 17-03 A 1 and 19-30, and Zoning Application 18-72
Document Type
NOD - Notice of Determination
Received
Posted
2/24/2020
Project Applicant
The Press Owner LLC

Document Description
The proposed project is an amendment to the previously-approved Preliminary Master Plan to replace the five-story, 190,000 square feet of office space previously approved for Phase 2 with an approximately 50,909-square-foot, two-story, indoor retail market hall within the southerly portion of the existing building (facing South Coast Drive).This project is a modification of the approved development plan, and it was determined that, compared to the previously approved mitigated negative declaration, no new impacts would occur nor would there be any substantial increase in the severity of any previously identified impacts.

Contact Information
Mel Lee
City of Costa Mesa
77 Fair Drive
Costa Mesa, CA 92626

Phone : (714) 754-5611

Location

Cities
Costa Mesa
Counties
Orange
Cross Streets
1375 Sunflower Ave, 1376 South Coast Dr, and 3370 Harbor Blvd

Notice of Determination

Approving Agency
City of Costa Mesa
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
77 Fair Drive, Costa Mesa, CA 92626

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination
2017061069_Addendum to the Preliminary Master Plan for Former LA Times   PDF 841 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print