Descanso Community Services District 2017 Water System Improvements

3 Documents in Project

Summary

SCH Number
2017061036
Lead Agency
Descanso Community Water District (DCWD)
Document Title
Descanso Community Services District 2017 Water System Improvements
Document Type
NOD - Notice of Determination
Received
Posted
10/23/2017
Present Land Use
res, special purpose, commercial, ag
Document Description
Construct joint treatment facility, install pipeline from Well #5 to Well #6, construct block wall building for iron and manganese treatment facility, install backwash tank, rehabilitation of Well #6, install permanent generator, automatic transfer switch and propane tank at Well #6, install portable generator and manual transfer switch at Well #5, install communication antenna at Well #6, install water distribution pipeline from Well #6 to existing distribution system, install flowmeter and groundwater levle sensors at Well #5 and Well #6, replace existing highline with underground water transmission pipeline along Viejas Grade Road, set up and use staging and laydown areas to facilitate work.

Contact Information

Name
Julianna Seevers
Agency Name
Descanso Community Water District
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
Viejas Grade Rd from hwy 79 to Tanglewood Rd & portions of Old Viejas Grade Rd
Zip
91916
Parcel #
public ROW
State Highways
79
Schools
Descanso ES
Waterways
Sweetwater River, Descanso Crk, Samagatuma Crk.
Other Location Info
Descanso

Notice of Determination

Approving Agency
Descanso Community Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.