Las Positas College 2012 Facilities Master Plan [California Endangered Species Act (CESA) Incidental Take Permit No. 2081-2017-009-03 (ITP)]
4 Documents in Project
Summary
SCH Number
2017042055
Lead Agency
Chabot-Las Positas Community College District
Document Title
Las Positas College 2012 Facilities Master Plan [California Endangered Species Act (CESA) Incidental Take Permit No. 2081-2017-009-03 (ITP)]
Document Type
NOD - Notice of Determination
Received
Posted
10/11/2017
Present Land Use
existing community college/education and institution/community college
Document Description
Project includes completing improvements to a 28-acre area of the Las Positas College campus by demolishing two older buildings, constructing six academic buildings, completing improvements to athletic fields and facilities, and rebuilding vehicle circulation, parking lots, and entries. Building construction will occur on 11.1 acres of developed land. Construction of the Sports Recreational Area will occur on 16.9 acres including 15.5 acres of non-native grassland and 1.4 acres of developed land uses northeast of Campus Loop.
The Project will result in impacts to 15.5 acres of CA tiger salamander (Ambystoma californiense) habitat; the Project will permanently remove 15.5 acres of CA tiger salamander habitat. The project is expected to result in incidental take of CA tiger salamander, which is designated as a threatened species under CESA. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.
Contact Information
Name
Scott Wilson
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Livermore
Counties
Alameda
Cross Streets
Campus Loop/Campus Hill Dr
Zip
94551
Total Acres
147
Parcel #
903-0010-002-02
State Highways
580
Airports
Livermore Municipal
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.