Carson Stormwater and Runoff Capture Project

2 Documents in Project

Summary

SCH Number
2017041058
Lead Agency
City of Carson
Document Title
Carson Stormwater and Runoff Capture Project
Document Type
NOD - Notice of Determination
Received
Posted
6/21/2017
Present Land Use
park/open space/recreation open space
Document Description
The project proposes to capture all dry-weather runoff from a nearby storm drain, County Project no. 1201, and the first flush of stormwater to reduce the transport of pollutants downstream in Wilmington Drain and Machado Lake. The proposed project includes the following components: An underground stormwater storage facility with a maximum capacity 17-acre feet at the Carriage Crest Park; A storm drain diversion system with a maximum intake of 30 cubic feet per second, including a rubber dam or a drop inlet structure and diversion pipelines; Pretreatment devices, such as hydrodynamic separators or nutrient baffle boxes to remove gross solids; A dewatering system to the sanitary sewer for further treatment at the Joint Water Pollution Control Plant at a maximum nightly discharge rate of 20 cfs, including a pump station and a discharge pipeline, and A return pipeline back to the existing downstream storm drain. The project will require a maximum excavation area of 1.5 acre to a depth of 28 feet and maximum removal of approx. 35,0000 cubic yards of soil from the park to accommodate construction of the storm water collection system.

Contact Information

Name
Julio Gonzalez
Agency Name
City of Carson
Contact Types
Lead/Public Agency

Location

Cities
Carson
Counties
Los Angeles
Cross Streets
West Sepulveda Blvd and South Figueroa St
Zip
90745
Total Acres
4.8
Parcel #
733-007-905
Railways
SPRR
Schools
Various
Waterways
Wilmington Drain and Torrance lateral
Township
4S
Range
13W
Section
T4S
Base
SBM

Notice of Determination

Approving Agency
City of Carson
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.