Mast Park Improvement Project

2 Documents in Project

Summary

SCH Number
2017041023
Lead Agency
City of Santee
Document Title
Mast Park Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
10/13/2017
Present Land Use
Public park, GP: park/open space; Z: Park/open space
Document Description
The City of Santee proposes improvements to the existing mast Park that would enhance existing facilities, replace outdated facilities and add new features to accommodate the long-term expectations of the community. Due to changing building codes and requirements set forth by the ADA, in addition to normal wear through the years, the project proposes to remove the outdated and worn park facilities. Project features would include a new, prefabricated restroom facility, prefabricated disc golf concession building, disc golf course, an extended paved parking lot that would accommodate an additional 41 parking spaces, new play structures, shade structures, park benches, picnic tables, informative signage, basketball court, and fencing. The existing paved meandering trails throughout the open space would be removed and replaced with walkable and bike friendly disintegrated granite surfacing and lodge pole fencing. On the easterly side of the project site, the proposed trails would connect to the San Diego River in Julian, CA, completing approx. 0.4 miles of the overall trail that is envisioned to someday stretch the entire length of the river to the Pacific Ocean. Construction is anticipated to take approx. 12 months to complete, during which time portions or all of the Mast Park may be closed to the public. All construction work, staging, and storage of construction materials would be contained within the project study area, which includes all areas within Park boundaries and small adjacent areas where temporary construction easements may be necessary.

Contact Information

Name
John O'Donnell
Agency Name
City of Santee
Contact Types
Lead/Public Agency

Location

Cities
Santee
Counties
San Diego
Cross Streets
Carlton Oaks Dr
Zip
92071
Total Acres
30
Parcel #
381-040-24-00/-12-000
State Highways
52, 125
Railways
SDIY
Airports
Gillespie Field
Schools
Carlton Hills ES
Waterways
San Diego River
Township
15S
Range
1W
Section
21, 28
Base
SB

Notice of Determination

Approving Agency
City of Santee
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print